The next morning brought the same pattern, and the morning after that, and Duncan stopped counting the days since the reopening. A contractor called about a delayed order and Kessler found it in the system without apology or explanation, because the order was simply ready now. A driver misjudged the turn near the bent column and corrected himself with a wave, as drivers had done since 2018. The cracked upper office window still rattled faintly when the wind came off County Road 18, and Duncan still promised himself he would replace it. None of that was new. All of it was the point. The warehouse had not been restored by a single day of deliveries. It had been restored by deliveries becoming unremarkable again, until no one in the building thought to mark the date at all.
The restitution accounting was done at Duncan's kitchen table, on a Saturday morning, with Sarah Kim's letter, Kessler's log, and a stack of receipts spread out in front of him. Duncan worked the way he always worked with numbers: slowly, in order, with a pen and a ruled notebook, checking each figure against its source before he wrote it down. Kim had explained that the criminal case would require a restitution schedule, separate from the civil settlements already paid, and that every dollar claimed would have to be documented. Duncan did not mind the requirement. Documentation was how he had run the company for eleven years, and it was how he had kept the deed, the tax receipts, and the business licenses in a cabinet where anyone who needed them could find them. Restitution would be no different.
The first line was the chain. The heavy gate chain, cut on the Tuesday morning, was listed at its replacement cost, with the invoice from the company's own supplier attached. The second line was the locks: the front locks Sandoval had replaced on Marissa's order, and the new locks installed after the occupation, each with its invoice and work order. The third line was the plaque: the cost of restoring the weathered metal plaque reading VALE INDUSTRIAL SUPPLY to the wall, including the new screws and the labor Kessler and Boyle had spent fastening it. The fourth line was the brick repair: the cost of filling and matching the four drill holes left by the association sign beside the loading bay, quoted by a mason who had examined the wall and written his estimate on letterhead.
The next lines were larger, and Duncan checked them twice. Four days of lost business: the orders that had not shipped during the occupation, the deliveries that had been turned away at the gate, and the revenue the company had lost while its own employees were kept out of its own building. Kessler's log supplied the dates and the orders, and the company's operating records supplied the figures. The lost business was not estimated from memory. It was taken from invoices that had not been filled, from manifests that had been delayed, and from the daily totals Kessler had recorded in the log he kept while the building was occupied. Kim had already confirmed that the civil settlements did not duplicate these figures, and Duncan noted that confirmation in the margin, in his own handwriting, so that the schedule would show its own care.
The final lines were the paid time. Kessler, Park, Herrera, and Boyle had been sent home with pay during the four days, and the company had paid them for work they had not been allowed to do. Their wages for those days were listed by name, by day, and by rate, with the payroll records attached. Duncan wrote each name carefully: Walt Kessler, June Park, Luis Herrera, Nate Boyle. He did not hurry through those lines. The four days had cost them worry as well as wages, but worry was not a line on a restitution schedule, and Duncan did not try to make it one. What could be documented was documented: the hours, the rates, the pay stubs, the dates. What could not be documented was left out, because a schedule that claimed more than it could prove would be worth less than a schedule that claimed only what it could prove.