Construction began in June. The first work was not glamorous. Crews placed survey stakes, marked underground services, installed erosion controls, and cleared a narrow area of invasive growth. The county's engineer walked the site with the contractor and verified the limits of excavation. A resident noticed a stake near the footpath and worried it marked a new fence line. The project manager explained what it represented and showed the approved plan. The resident asked for a copy. The manager provided one. The exchange took five minutes, but it prevented a rumor from spreading through the neighborhood.

Celeste volunteered to help with the community information table on the first Saturday of construction. She did not wear an association badge or act as a spokesperson. She laid out the public plan, the contact sheet, and a calendar of scheduled work. When someone asked about the battery enclosure, she pointed to the county engineer's information page rather than attempting to answer from memory. When someone asked whether the transformer near the central square would be moved, she explained that it was a separate utility asset and that the hub would have its own approved connection. She offered to contact Mateo for a technical answer if the question required more detail.

A man named Omar Ellis stopped at the table with his young daughter. He had moved into Larkspur Crossing only three months earlier and had not been present during the outage. He asked why the association had a separate register for infrastructure and whether every neighborhood needed one. Celeste explained that the register recorded who owned and maintained the systems that crossed common areas. It did not contain every technical detail, but it helped the association identify the correct authority before hiring a contractor. She told him about the transformer incident, including her own role in approving the removal. She did not turn the story into a confession designed to earn sympathy. She explained what had happened, what had been learned, and how the procedures had changed.

Omar listened carefully. He said he appreciated the honesty. In his previous neighborhood, he had served on a maintenance committee and had watched a board spend money replacing decorative lights while ignoring a drainage issue. He asked whether he could join the infrastructure group. Celeste said the group had room for another volunteer and gave him Nia's contact information. His daughter picked up a leaflet about the cooling center and asked whether there would be a place to read books. Celeste said the county was considering a small shelf for donated books and that the design team would welcome suggestions. The child took two leaflets and tucked them into her backpack.

As construction continued, residents became familiar with the sound of work. A concrete truck arrived one morning and blocked part of the county road for twenty minutes. The contractor had posted the notice, but several drivers had not seen it. Nia asked the project manager to place an additional sign at the entrance. A delivery driver complained that the footpath work was taking too long. Amara explained that the crew was waiting for an inspection of the drainage base. The delay was frustrating, but it was preferable to covering a section that had not passed review. The contractor adjusted the schedule and published an updated date.

One afternoon, Celeste saw a crew member placing a temporary cover over an exposed utility trench. She asked whether the work had been inspected. The crew member showed her the permit card and said the county inspector had signed the stage release. Celeste read the card, thanked him, and walked on. She did not ask him to explain the technical work or suggest a different method. She had learned that oversight was not the same as directing people who were qualified to do the job. Her role was to know which evidence should exist and where it could be found.

June visited the site with her planning team. She had been asked to prepare a short case study on community participation in heat resilience. She told Celeste that the county's design had been improved by resident comments, especially the accessible route and the operating hours. She also said the county had learned to separate the public engagement process from the technical approval process. Residents could influence the location, services, and appearance of the hub, but they could not vote a battery design into compliance or waive utility requirements. The distinction had helped the project move forward without confusing public preference with professional authority.