The county investigator's next update arrived in the same week. The investigation had identified evidence that Daniel and Martin coordinated payments to Cedar Advisory and a group of contractors. The investigator said the records suggested that some expenses were disguised to support the proposed development, but the review was ongoing. The county referred the financial findings to the state attorney's office. No charges had been filed yet. Daniel's attorney issued another statement calling the inquiry incomplete and insisting that his client had acted for the benefit of Cedar Vale.
Marisol asked Karen whether she would testify if the state attorney's office requested it. Karen said yes. She also asked whether Karen had kept any personal notes or copies of the authorizations. Karen brought them the next day. Some notes were incomplete, and she had thrown away several routine envelopes after the board approved the annual reports. She felt ashamed as she placed the remaining records on the table. Marisol did not criticize her. “We work with what exists,” she said. “And we make sure the next board never has to depend on memory.”
The restoration contract became the new board's first major decision. Eastline Waterworks had proposed a phased plan, with the county overseeing the main channel work and the HOA responsible for the garden relocation and long-term landscape maintenance. The contractor's bid was higher than the original estimate because the pump house required additional work and the old footbridge had to be removed. The county grant covered the bulk of the public infrastructure. Meridian's contribution funded part of the outlet and the new survey markers. The HOA's share would be paid through reserves and the approved special assessment.
Marisol insisted on a public bid comparison. Three contractors were invited to submit proposals. One declined because the project required work near the active channel. Another offered a cheaper design that used a narrower concrete pipe. Eastline's proposal was not the lowest, but it included the hydraulic model, independent testing, and a five-year maintenance plan. The procurement committee recommended Eastline. Residents could review the bids at the clubhouse and submit questions before the board vote.
At the meeting, George Mitchell asked why the HOA was spending extra money on native plants and a boardwalk. Nia explained that the planting plan would stabilize the banks and that the boardwalk would allow residents to access the wetland without walking through sensitive areas. George said he could accept the boardwalk but wanted a small space where gardeners could sit and exchange seeds. Marisol added a community planting table to the design. The change cost very little and made the plan feel more welcoming.
When the contract came to a vote, Marisol asked Karen whether she wanted to speak. Karen stood and said only that the scope should include the county's access rights, public inspection schedule, and a clear record of any change orders. She recommended that each payment be tied to a verified milestone and that no single officer be able to authorize a large payment. She then returned to her seat. The board approved the contract unanimously.
The first phase began in early spring. Workers removed the damaged footbridge and exposed the old channel. The stone walls were uneven but largely intact. In places, roots had grown through the joints. The contractor used small equipment to clear the sediment and carefully remove the unauthorized fill. Lena Ortiz inspected the work every week. Nia visited the site with the landscape architect and made sure the temporary paths remained accessible. Residents watched from behind the safety fencing, sometimes curious, sometimes frustrated by the noise.
The most difficult day came when the excavators uncovered a section of the channel that had collapsed beneath a stand of willows. The crew stopped work and asked the engineer to assess the foundation. The damage was worse than the original model predicted. A support wall would need to be rebuilt, and the project would be delayed by several weeks. The contractor issued a change order with a detailed cost breakdown. Marisol posted it online before the board considered it.
Some residents complained that the costs would never end. Patricia argued that the new board had underestimated the project to win the election. Peter Lang asked for a special finance meeting. Marisol agreed. Priya, whose audit contract had ended, attended as an outside adviser and explained the difference between a genuine unforeseen condition and an unsupported invoice. The board approved the change order after the county confirmed the engineering need and the procurement committee compared the labor estimate with local rates.