The association's board met in an emergency session to decide what to do about the asphalt. Mark began by reading the paving invoice and field log into the record. He explained that the board had not approved the overnight placement and that the work had not been disclosed in the progress reports. Richard Bell advised the directors to notify the court, the insurer, and the Millers' attorney. He also recommended that the association instruct every contractor to remain off the disputed parcel and take no action that could damage the pavement or the surrounding ground until a restoration plan was approved.
A director asked whether the asphalt could simply be left in place until spring. Grace Wilcox, who had been invited to explain the drainage issue, said the surface altered runoff and blocked part of the maintenance corridor. Leaving it might be acceptable only as a temporary condition under a controlled plan, not as an operating runway. The county would need to review how water moved around the edges and whether the surface created a hazard for equipment or livestock.
Mark said the board should not decide what to do with the Millers' land without the owners' consent or a court order. Linda agreed. Sheila asked who had authorized the paving crew. The management company produced the work order, which carried Hoa's signature and referred to the “western tie-in.”
Hoa was no longer president, but the board invited her to explain the instruction. She arrived with Richard Bell and sat at the end of the table. She said the paving crew had been told to complete the first phase of the access surface, not to build an operational runway. She said she believed the contractor was staying within the corridor shown on the approved concept map.
Mark placed the map beside the independent survey. “The approved concept map was not the recorded property line. You had the certified easement before this work order was issued.”
Hoa looked at the invoice. “I did not know they had placed asphalt beyond the boundary.”
“Did you ask them to verify the boundary before pouring?”
She did not answer.
Richard advised that the association should not make accusations before the full review. But he also said that the board had a duty to disclose the documents and correct any public description of the work. The directors voted unanimously to notify the court that an asphalt section had been placed on the Miller parcel before the temporary injunction, despite the owners' written objection. They also authorized a formal request that the contractor and Westline preserve all field logs, text messages, and instructions.
The board then considered whether to cancel the grand opening permanently. Mark said it had already been suspended, but the event coordinator had received a message from Westline asking whether a private “investor preview” could still proceed. The message proposed a small plane demonstration and a photography session. It did not mention the court order.
The directors were stunned.
“Who approved that?” Sheila asked.
Mark said no one on the current board had. He asked the management company to contact Westline and state that no event was authorized on the runway or the Miller parcel. Richard said he would send a separate legal notice.
Hoa heard the discussion with a fixed expression. She said Victor had told her that the preview was only a private gathering for invited investors and that the plane would remain on the association-owned portion. Mark asked whether she had agreed to help organize it. She said she had discussed the possibility before her resignation, but had not authorized an event after the court order.
Linda asked whether she had warned Victor that the order prohibited runway activity across the Miller land. Hoa looked at her papers. “I have not spoken to him since our last meeting.”
It was not a complete answer, but no one pushed her further in that session.
After the meeting, Richard sent the cease-and-desist notice. Westline replied that the investor preview was merely a private event and that no aircraft operation would occur without the pilot's approval. The board replied that no event was authorized on association property while the site was under review and no access was permitted across the Miller parcel.
Mark assumed that would end it. He was wrong.
Victor had already reserved the photographer, invited several investors, and spoken with a pilot who believed the runway was nearing completion. He considered the court order a barrier to construction, not a reason to cancel a private gathering. His plan was to stage a ceremonial taxi on the asphalt, take photographs, and demonstrate that the strip was physically usable. He thought that once the investors saw a plane on the pavement, the association would find it harder to abandon the project.