Samuel kept that letter, after his father's death, in the fireproof box with the deeds. He had read it so many times that he could have recited it, and some nights, in the years of the quarrel that followed, he did recite it, standing in the pumphouse doorway, as a man might recite the terms of a treaty the other side has decided to forget.
The main never arrived. The season ended, and the line was not capped. Phase One of Magnolia Bend was built along the buried line, forty-six houses in the end, each one connected, each one drawing, morning and evening, through pipes that appeared on no county record, under a permission that had expired in the year it was written. Samuel discovered the full extent of it slowly, the way a man discovers a leak, by signs. The pumphouse hours lengthening. The static level in the well falling by inches, then by feet, across the years of his father's book becoming his book. The electricity bills, which he paid, because the meter at the pumphouse was in his name and the account had been his father's and a bill with your name on it is a difficult thing to leave unpaid without consequences you can foresee. He raised the matter in writing in 2009, in a letter to the developer's successor company and to the homeowners' association that had by then taken over the subdivision's affairs, a careful engineer's letter with figures attached, asking for a meeting, a metering arrangement, a plan. He received a courteous acknowledgement and no meeting. He raised it again in 2016, by then retired and living in the farmhouse full time, in a second letter, shorter and less courteous, sent by certified mail. He received no reply at all. By then Phase Two had been built, and Phase Three, and the houses stood in their three loops of curving street above his orchard, one hundred and forty-eight homes in all, with green lawns in August and full baths and washing machines running on Sunday mornings in a chorus he could measure, if he chose, on his sub-meter, in kilowatts.
He had not known, until the year of the inspection, that Phases Two and Three were connected at all. That was the thing he would say later, to his daughter and to the inspector and once, quietly, to himself in the pumphouse doorway, as the closest thing to an admission the record would ever get from him. He had believed, because the draw matched a burden he had grudgingly learned to model, that it was Phase One alone, forty-six houses and the sales office long since become a house itself. He had built his grievance, and his electricity budget, and a certain portion of his understanding of his neighbours, on a number that was wrong by more than a hundred houses. The well had been carrying the whole of Magnolia Bend for years, and the only man who had been measuring it had not understood the size of what he was measuring, because a meter tells you how much and never from where.
On the morning the excavator came, the letter from the homeowners' association had been on Samuel's kitchen table for eleven days. It was the third document in what he had begun, with grim formality, to call the file, and it lay beside the other two in a row, the way his father would have laid out tools before a job. The first document was a notice of violation, printed on association letterhead, informing him that an inspection had determined his well system to be an unpermitted public utility operating in violation of association covenants and county code, and that the association, in its capacity as the body responsible for the community's water infrastructure, would be obliged to regularise the situation. The second document was a fine, assessed against his parcel in the amount of fourteen thousand two hundred and fifty dollars, for unauthorised well expansion, a phrase Samuel had read four times with his lips moving, trying to find in it any event in the history of his family's land that it could honestly describe. The third document was the one that mattered. It was an easement and water service agreement, drafted by a lawyer, twenty-two pages long, by which Samuel Osei would grant the Magnolia Bend Homeowners' Association a permanent easement over his parcel and control of his well, his pumphouse, and his distribution works, retroactive to 1999, and would accept, in exchange, the waiving of the fine and a monthly stipend for electricity that was less than a tenth of what the sub-meter said the pumps consumed. He was to sign it by the end of the month. The covering letter, which was signed by Raymond Kessler, the association's president, used the word legacy once and the word partnership three times.