unwinding past the dark fields and the lit windows of Kingsbury and then the
unlit stretch along the creek bottom where the county's survey stakes had
already begun to appear, small orange flags on wire stems, marking the
section to be restored. Rosa watched them pass in the headlights for a while
without speaking.
They will want a bridge again by spring, she said at last. You know that.
People need to cross their own creek. The school bus stop is on the other side
for the Alvarado children. My mother crossed at the second bridge every day
of the summer with her little dog. By spring they will have forgotten the
water and remembered the walking, and they will be right to, Marcus. It is
their creek too. Will you design it?
The county road crossed the creek at the subdivision's entrance on the old
culvert, and he slowed for it out of a habit older than the fall, feeling the car
take the little rise, the water somewhere below in the dark going about its
business at a depth nobody had to think about, which was the depth water
was owed. He thought about the question at the length it deserved. He had
declined a presidency twice that night in front of several hundred people.
This was a smaller room and a larger responsibility, and it was the work he
was actually for, which he had told the gym was the only work he would
accept.
Yes, he said. On the record, Rosa, the way we do things now.
Tell me the record, she said, smiling for the first time that night, in the dark
of the car, like a woman asking for a song she already knows by heart.
99
Permits first, he said. Before a line is drawn that anyone falls in love with,
the permit, applied for and issued, for a structure in that channel. The stamp
on the drawing, a licensed engineer's no-rise, mine or another man's, it does
not matter whose, so long as it is real and it is read aloud. Footings out of the
water's way or no footings at all. A span the creek can pass under on its worst
night, with the debris it will bring, at the height the map says it will bring it.
And if it cannot be built that way, Rosa said.
Then it does not get built, he said. The water passes under it, or it does not
get built.
They took the covered bridge apart in the reverse of the order it had gone up,
and Marcus stood on the bank the first morning with his hands in his jacket
pockets and watched a building become lumber again.
The roof came off first. A man in a lift bucket unnailed the cedar shakes in
rows and handed them down, and the shakes went into a bin, because shakes
are cheap and new ones are better. Then the siding, board by board, each
board chalked with a number as it came free so that it could find its place
again if anyone ever wanted it to. Then the trusses stood naked against the
sky for one afternoon, two king-post trusses of good Douglas fir, and Marcus
found that he was sorry to see them bare. They were the only honest work in
the whole three-bridge folly. Somebody's crew had framed them true,
whatever else had been untrue about the enterprise, and the wood had done
nothing but hold up a roof over a creek it had no business obstructing.
The salvage had been his suggestion and the committee's vote, taken at the
first meeting of the new water committee in the second week of October,
with the recall nine days behind them and the county's order framed, in effect
100
if not in fact, on the clubhouse wall. The covered bridge was common
property and sound timber, and there was no sense feeding sound Douglas fir
to a landfill to satisfy anybody's wish to be done with the sight of it. What the
association might not build again, it could at least keep. The trusses were
lowered by crane onto a flatbed with the care usually reserved for pianos, and
the timbers were stacked on the common beside the trailhead, stickered
between layers so the air could move through them, and covered with a tarp
weighted against the wind. Marcus chalked the top board of the stack
himself. He did not write anything elegiac. He wrote the date, and the words
COVERED BRIDGE, FIR, SOUND, and the count of board feet, which he
had computed on the walk over.
The arched bridge was not so much dismantled as recovered. It had gone in
the September flood the way Marcus had told the board in August it would
go, which was to say as debris: the deck torn off its bearings and folded
down into the channel, one abutment undercut and slumped, the arch ring
cracked across the crown and holding, where it held, by the habit of its
shape. For three weeks the association's contractor worked it out of the creek
with an excavator fitted with a thumb and a man in waders with a cutting
torch, lifting broken concrete and twisted rebar up the bank piece by piece,
and everything that came out went past a county inspector's eye before it
went into a truck, because the order said the channel would be restored to its
surveyed section and the county intended to know what had been in it. The