HOA Karen Built Three Bridges On His Land — Unaware The Dam Engineer Upstream Could Drain Her Park’s Biggest Attraction

Chapter 39

Theme:
Font Size:
24px

unwinding past the dark fields and the lit windows of Kingsbury and then the

unlit stretch along the creek bottom where the county's survey stakes had

already begun to appear, small orange flags on wire stems, marking the

section to be restored. Rosa watched them pass in the headlights for a while

without speaking.

They will want a bridge again by spring, she said at last. You know that.

People need to cross their own creek. The school bus stop is on the other side

for the Alvarado children. My mother crossed at the second bridge every day

of the summer with her little dog. By spring they will have forgotten the

water and remembered the walking, and they will be right to, Marcus. It is

their creek too. Will you design it?

The county road crossed the creek at the subdivision's entrance on the old

culvert, and he slowed for it out of a habit older than the fall, feeling the car

take the little rise, the water somewhere below in the dark going about its

business at a depth nobody had to think about, which was the depth water

was owed. He thought about the question at the length it deserved. He had

declined a presidency twice that night in front of several hundred people.

This was a smaller room and a larger responsibility, and it was the work he

was actually for, which he had told the gym was the only work he would

accept.

Yes, he said. On the record, Rosa, the way we do things now.

Tell me the record, she said, smiling for the first time that night, in the dark

of the car, like a woman asking for a song she already knows by heart.

99

Permits first, he said. Before a line is drawn that anyone falls in love with,

the permit, applied for and issued, for a structure in that channel. The stamp

on the drawing, a licensed engineer's no-rise, mine or another man's, it does

not matter whose, so long as it is real and it is read aloud. Footings out of the

water's way or no footings at all. A span the creek can pass under on its worst

night, with the debris it will bring, at the height the map says it will bring it.

And if it cannot be built that way, Rosa said.

Then it does not get built, he said. The water passes under it, or it does not

get built.

They took the covered bridge apart in the reverse of the order it had gone up,

and Marcus stood on the bank the first morning with his hands in his jacket

pockets and watched a building become lumber again.

The roof came off first. A man in a lift bucket unnailed the cedar shakes in

rows and handed them down, and the shakes went into a bin, because shakes

are cheap and new ones are better. Then the siding, board by board, each

board chalked with a number as it came free so that it could find its place

again if anyone ever wanted it to. Then the trusses stood naked against the

sky for one afternoon, two king-post trusses of good Douglas fir, and Marcus

found that he was sorry to see them bare. They were the only honest work in

the whole three-bridge folly. Somebody's crew had framed them true,

whatever else had been untrue about the enterprise, and the wood had done

nothing but hold up a roof over a creek it had no business obstructing.

The salvage had been his suggestion and the committee's vote, taken at the

first meeting of the new water committee in the second week of October,

with the recall nine days behind them and the county's order framed, in effect

100

if not in fact, on the clubhouse wall. The covered bridge was common

property and sound timber, and there was no sense feeding sound Douglas fir

to a landfill to satisfy anybody's wish to be done with the sight of it. What the

association might not build again, it could at least keep. The trusses were

lowered by crane onto a flatbed with the care usually reserved for pianos, and

the timbers were stacked on the common beside the trailhead, stickered

between layers so the air could move through them, and covered with a tarp

weighted against the wind. Marcus chalked the top board of the stack

himself. He did not write anything elegiac. He wrote the date, and the words

COVERED BRIDGE, FIR, SOUND, and the count of board feet, which he

had computed on the walk over.

The arched bridge was not so much dismantled as recovered. It had gone in

the September flood the way Marcus had told the board in August it would

go, which was to say as debris: the deck torn off its bearings and folded

down into the channel, one abutment undercut and slumped, the arch ring

cracked across the crown and holding, where it held, by the habit of its

shape. For three weeks the association's contractor worked it out of the creek

with an excavator fitted with a thumb and a man in waders with a cutting

torch, lifting broken concrete and twisted rebar up the bank piece by piece,

and everything that came out went past a county inspector's eye before it

went into a truck, because the order said the channel would be restored to its

surveyed section and the county intended to know what had been in it. The

News in the same category

HOA Karen Built Three Bridges On His Land — Unaware The Dam Engineer Upstream Could Drain Her Park’s Biggest Attraction

45 Part