stood in this same channel in 2007 with a survey crew between them and
agreed, over two days of levels, where the floodway line would run. The
letter was three paragraphs. It identified the project by name. It stated that
structures were proposed in the designated floodway of Dry Creek. It asked
whether floodplain development permits and no-rise certifications had been
applied for or issued for the three crossings. It did not accuse anybody of
anything. Marcus had learned long ago that the most lethal sentence in an
official letter was a question with a date on it.
The answer came three weeks later, on county letterhead, courteous as a
christening. Reyes wrote that the county had on file a permit for the
Creekwalk trail — surface construction, with benches and signage listed as
associated amenities — issued the previous fall. He wrote that bridge
structures within the regulatory floodway were a separate matter, requiring
floodplain development permits and a no-rise certification, sealed by a
registered professional engineer, demonstrating that the structures would
cause no increase in the one-hundred-year water surface elevation. He wrote
that no such applications had been received for any crossing of Dry Creek in
Rio Seco Estates. He wrote that the county's enforcement of the floodplain
ordinance was, given staffing, substantially complaint-driven, and that in
response to Marcus's letter an inspector would visit the site. Marcus read the
letter twice at the kitchen table, and the second time he read it the way he
read dam inspection reports from owners' engineers, for the load-bearing
words. Applied for: none. Enforcement: complaint-driven. Inspector: will
22
visit. He filed it in the folder where he kept the creek, a folder that had begun
in 2007 with the floodway maps and now had the thickness of a small book,
and he waited to see what a visit looked like.
It looked like a Tuesday. The inspector came in the second week of May, on
a morning when Marcus was ninety miles away inspecting a municipal dam
whose spillway had a mesquite growing in it the size of a picnic table, and he
learned about the visit afterward, from the copy of the inspection memo
Reyes sent him as a courtesy, because twenty years of levels run both ways.
The inspector had walked the trail from the clubhouse trailhead to the second
overlook and back. He had photographed the trail surface, the benches, and
the covered bridge's footings, which that week stood as formed concrete on
the banks with a silt fence below them, innocent as foundations anywhere.
He had not walked the mid-creek reach — the memo did not say why, and
Marcus, who had written a thousand field memos, could read the shape of the
omission: the visit had been announced, the association's manager had met
him at the trailhead with coffee and a map, and the map's blue ribbon ended,
for touring purposes, at the overlook. Of the arched bridge there were, that
Tuesday, only stakes in the channel and a stockpile of sandbags under a tarp,
which photographed as landscaping supplies. The memo concluded, in the
flat dialect of its kind: No violation observed at time of visit. Structures in
floodway: none noted. Marcus put it in the folder. The piers went in the
following week, in the interval between that visit and any conceivable next
one, rising out of the channel bed like a crop between rains, and he
understood that he had been privileged to watch the exact machinery by
which a thing could be at once entirely documented and officially unseen.
Everyone had been polite. Everyone had been procedural. The file was
immaculate. The file was the problem's best friend.
23
His second letter to the board went out the last week of May, with Reyes's
reply enclosed, and it was shorter than his first. It said that the county had
now confirmed in writing that no floodplain permits or no-rise certifications
existed for the Creekwalk's bridges; that two of the three structures were
already under construction in the designated floodway; and that the
association was therefore building, with assessment funds, unpermitted
structures in a mapped floodway upstream of its own members' homes. It
asked the board to stop work on the in-channel structures until the permits
were applied for and the no-rise question answered by an engineer with a
seal. It did not use the word liability. Marcus had found, in his career, that
men who used the word liability in the first letter rarely got to write a second
one that was read. The reply arrived the day before he left for the Panhandle,
on association letterhead, over Deb Callahan's signature, and it was three
sentences long. The board thanked Mr. Webb for his professional interest in
the Creekwalk project. The board noted that the project's engineering review
was scheduled with the county. The board looked forward to seeing Mr.
Webb at the opening in June. He read it standing at the mailbox, with the rest
of the mail under his arm, and then he went up to the house and put it in the
folder, on top of the inspection memo, and got out his inspection kit for the
tour, and if there was a sentence in Deb's letter he carried with him onto the
caprock for two weeks, it was scheduled with the county — a phrase that did
the work of a permit, a study, and a conscience, all three, at no cost to
anybody, in the passive voice.
The Panhandle tour took two weeks and three thousand feet of elevation he