HOA Karen Built Three Bridges On His Land — Unaware The Dam Engineer Upstream Could Drain Her Park’s Biggest Attraction

Chapter 9

Theme:
Font Size:
24px

stood in this same channel in 2007 with a survey crew between them and

agreed, over two days of levels, where the floodway line would run. The

letter was three paragraphs. It identified the project by name. It stated that

structures were proposed in the designated floodway of Dry Creek. It asked

whether floodplain development permits and no-rise certifications had been

applied for or issued for the three crossings. It did not accuse anybody of

anything. Marcus had learned long ago that the most lethal sentence in an

official letter was a question with a date on it.

The answer came three weeks later, on county letterhead, courteous as a

christening. Reyes wrote that the county had on file a permit for the

Creekwalk trail — surface construction, with benches and signage listed as

associated amenities — issued the previous fall. He wrote that bridge

structures within the regulatory floodway were a separate matter, requiring

floodplain development permits and a no-rise certification, sealed by a

registered professional engineer, demonstrating that the structures would

cause no increase in the one-hundred-year water surface elevation. He wrote

that no such applications had been received for any crossing of Dry Creek in

Rio Seco Estates. He wrote that the county's enforcement of the floodplain

ordinance was, given staffing, substantially complaint-driven, and that in

response to Marcus's letter an inspector would visit the site. Marcus read the

letter twice at the kitchen table, and the second time he read it the way he

read dam inspection reports from owners' engineers, for the load-bearing

words. Applied for: none. Enforcement: complaint-driven. Inspector: will

22

visit. He filed it in the folder where he kept the creek, a folder that had begun

in 2007 with the floodway maps and now had the thickness of a small book,

and he waited to see what a visit looked like.

It looked like a Tuesday. The inspector came in the second week of May, on

a morning when Marcus was ninety miles away inspecting a municipal dam

whose spillway had a mesquite growing in it the size of a picnic table, and he

learned about the visit afterward, from the copy of the inspection memo

Reyes sent him as a courtesy, because twenty years of levels run both ways.

The inspector had walked the trail from the clubhouse trailhead to the second

overlook and back. He had photographed the trail surface, the benches, and

the covered bridge's footings, which that week stood as formed concrete on

the banks with a silt fence below them, innocent as foundations anywhere.

He had not walked the mid-creek reach — the memo did not say why, and

Marcus, who had written a thousand field memos, could read the shape of the

omission: the visit had been announced, the association's manager had met

him at the trailhead with coffee and a map, and the map's blue ribbon ended,

for touring purposes, at the overlook. Of the arched bridge there were, that

Tuesday, only stakes in the channel and a stockpile of sandbags under a tarp,

which photographed as landscaping supplies. The memo concluded, in the

flat dialect of its kind: No violation observed at time of visit. Structures in

floodway: none noted. Marcus put it in the folder. The piers went in the

following week, in the interval between that visit and any conceivable next

one, rising out of the channel bed like a crop between rains, and he

understood that he had been privileged to watch the exact machinery by

which a thing could be at once entirely documented and officially unseen.

Everyone had been polite. Everyone had been procedural. The file was

immaculate. The file was the problem's best friend.

23

His second letter to the board went out the last week of May, with Reyes's

reply enclosed, and it was shorter than his first. It said that the county had

now confirmed in writing that no floodplain permits or no-rise certifications

existed for the Creekwalk's bridges; that two of the three structures were

already under construction in the designated floodway; and that the

association was therefore building, with assessment funds, unpermitted

structures in a mapped floodway upstream of its own members' homes. It

asked the board to stop work on the in-channel structures until the permits

were applied for and the no-rise question answered by an engineer with a

seal. It did not use the word liability. Marcus had found, in his career, that

men who used the word liability in the first letter rarely got to write a second

one that was read. The reply arrived the day before he left for the Panhandle,

on association letterhead, over Deb Callahan's signature, and it was three

sentences long. The board thanked Mr. Webb for his professional interest in

the Creekwalk project. The board noted that the project's engineering review

was scheduled with the county. The board looked forward to seeing Mr.

Webb at the opening in June. He read it standing at the mailbox, with the rest

of the mail under his arm, and then he went up to the house and put it in the

folder, on top of the inspection memo, and got out his inspection kit for the

tour, and if there was a sentence in Deb's letter he carried with him onto the

caprock for two weeks, it was scheduled with the county — a phrase that did

the work of a permit, a study, and a conscience, all three, at no cost to

anybody, in the passive voice.

The Panhandle tour took two weeks and three thousand feet of elevation he

News in the same category

HOA Karen Built Three Bridges On His Land — Unaware The Dam Engineer Upstream Could Drain Her Park’s Biggest Attraction

45 Part