Creekwalk's centerpiece and it was designed the way centerpieces are, from
the photograph inward. The renderings showed a graceful masonry arch, low
and romantic, springing from the channel's banks with the trail rising over it
in a gentle hump, and they showed it in the season when the creek was a
trickle and a family of four stood on the crown with a picnic basket. What the
renderings did not show was the structure underneath the grace: two
reinforced concrete piers standing in the bed itself, because the arch's thrust
had to land somewhere and the designer had landed it mid-channel, and a
deck whose underside — the low chord, in the language Marcus used in
reports — hung a bare six feet above the limestone bed. He watched them
19
build it through May. First the sandbag cofferdam, a crescent of filled sacks
diverting the trickle around the work area, and a pump coughing all day in
the heat. Then the excavation, the forms, the rebar cage wired together by
men standing in the channel in rubber boots, the concrete coming down the
chute in gray folds and being vibrated into place by a boy with a stinger who
could not have been twenty. It was handsome work. That was the thing
nobody wanted to hear from him and the thing he kept putting in the
notebook anyway, because it was true: the piers were well formed, the
concrete well cured, the stone veneer — for the arched bridge was to be
faced in cut limestone, to match a creek it was in the process of strangling —
laid by a mason with a real eye. Craft was not the deficiency. The deficiency
was location and arithmetic, and arithmetic had no constituency at the
ribbon-cuttings.
He measured it on a Sunday evening when the crews were gone, with a
stadia rod and a hand level and the notebook, the way he had measured
structures on four continents' worth of inspection tours, which is to say
without anger, in stations. The natural section at the bridge site, bank to bank
at the top of the channel, ran fifty-two feet. At bank-full the creek there
wanted a waterway area of a little over three hundred square feet, bed to the
grass line. The two piers, each three and a half feet thick in the direction of
flow and standing fourteen feet apart at the throat, took their share first. The
low chord took the rest: at six feet of depth the deck itself began to act as a
dam with a slot under it, and everything above six feet had to go somewhere
else, which in practice meant up, and out, and through the back fences of the
lots that fronted the bend. He set the rod against the upstream face of the
nearer pier and photographed it with the tape extended, the numbers legible,
the way an engineer files weather — not as an argument, exactly, but as a
dated observation, because he had learned in thirty years of reports that the
20
photograph you took before the event was worth forty affidavits after it. In
March, working from the renderings, he had written the board that the arched
bridge would constrict the channel by roughly forty percent at the
Emergency Action Plan's full-release flow. Standing in the dry bed with the
built concrete in front of him, he revised the estimate the way you revise a
bid that has met the ground. The renderings had been optimistic. With debris
racked against the piers — and debris always racked; a creek at work carried
whole trees the way a river at rest carried leaves — the effective constriction
at bank-full ran closer to half. He wrote the number in the notebook and
underlined it once, not twice. Underlining twice was for men who expected
to be believed.
That night he laid the March letter and the notebook side by side on the
kitchen table, the way he laid drawings side by side in review meetings, and
let the two estimates argue with each other in silence. In March the piers had
been two rectangles on a rendering, and he had charged them with forty
percent, and been thought shrill for it by a room full of his neighbors. In May
they were three and a half feet of cured concrete apiece with a mason's
limestone over them, and the river's arithmetic had come in worse than his
accusation. He could not remember another occasion in thirty years when
being right had arrived in quite this condition, unaccompanied by any use for
itself. He put the photograph of the rod against the pier on top of the folder,
and under it, in pencil, the date and the station, and beneath the figures he
wrote the downstream inventory the constriction would collect its toll from,
because a report should always name what a number costs: the bend lots, the
low fences, Rosa Jimenez's garden, the Sandoval place's successor with the
new barn in the old one's footprint. Then he closed the folder and went out
on the porch and listened to the creek do nothing at all, at a trickle, in the
dark, beautifully within its banks.
21
He had written to the county in April, before the first footing was poured,
because a letter written before the fact was a different instrument from a
complaint written after it, and Marcus understood instruments. The letter
went to Paul Reyes, the county floodplain administrator, a man Marcus had
known professionally for twenty years, since the map revisions — they had