HOA Karen Built Three Bridges On His Land — Unaware The Dam Engineer Upstream Could Drain Her Park’s Biggest Attraction

Chapter 6

Theme:
Font Size:
24px

typewritten tracks — the whole document of the creek, in its own hand —

like a man who has been asked, politely and by a large majority, to stop

citing it.

He did not sleep the whole of that night, and somewhere in its middle hours

he did what he had known since the fourth row that he was going to do: he

took the lantern and the folding rule he kept in the truck and walked down

through his own pasture to the creek, and then up the dry bed in the dark to

the pecan grove reach, where the channel made its long arc and narrowed. He

had measured that reach before, years ago, for the map comments, but a

number a man intends to put in a letter over his own signature is a number he

measures again, so he measured it again, alone, at two in the morning, by

lantern light, with the moths troubling the flame: thirty-eight feet, bank to

bank, at the narrow point, with the bed falling away in its limestone shelves

exactly as it had in 2007. He set the rule across the places where the drawing

14

put its piers — he could see the little table legs in the blue room as plainly as

if the easel had followed him home — and he subtracted pier and abutment

and the scour allowance any honest design would carry, and the arithmetic

came out where it had come out in the clubhouse, at forty percent, give or

take the width of a man's hand. Forty percent of thirty-eight feet. What was

left for the water was a doorway, and the water that would come through that

doorway would be carrying the valley. He stood in the dry channel in the

dark with the rule in his hand and the pecans black above him, and he was

aware, without self-pity, that he had become the sort of man who measures

creeks at two in the morning because a meeting has voted, and that there

were worse sorts of man to be, and that none of them, worse or better, could

change the width of the reach by an inch. Then he walked home under the

stars, put the rule back in the truck, and made a note of the measurement and

the hour on the pad by the telephone, in his report hand, because a number

without its ancestry was just an opinion, and he had no intention of giving

the board an opinion. He intended to give them a measurement.

He wrote the letter the next morning at his kitchen table, with the county's

flood hazard panel spread beside his coffee and the dam's Emergency Action

Plan — his own copy, soft at the corners from years of being the sort of

document a man keeps — open at the release protocol. He wrote it the way

he wrote inspection reports, in the belief that a fact correctly stated was a

kind of structure, and might stand when other things washed. Dear President

Callahan and Members of the Board, it began, and then it laid its courses one

on another: the channel of Dry Creek through Rio Seco Estates is a

designated floodway under the county flood damage prevention order, per

the flood hazard maps adopted 2007, panel cited by number; structures

within a floodway require a county floodplain development permit and a

sealed no-rise certification; the three proposed Creekwalk bridges, by their

15

piers, abutments, and deck elevations, would constrict the channel — he gave

the estimate, forty percent at the mid-creek arched crossing, and the method

behind it in a footnote, because he was incapable of giving a number without

its ancestry; a constriction in a debris-carrying floodway functions as a

partial dam, raising water surfaces upstream and increasing velocities and

scour downstream, with the low lots on the north bank and at the southern

bend the first recipients of both; the Kingsbury Lake dam, two miles

upstream, operates under an Emergency Action Plan providing for controlled

releases up to full gate opening in a flood event, with Dry Creek reaching

and exceeding bank-full — seven feet in the channel — within hours of a

release combined with local runoff; the undersigned, a licensed professional

engineer practicing in dam safety, who participated in the preparation of that

plan, requests that this letter be filed with the records of the Creekwalk

project, and respectfully advises the board that the association's trail permit

does not, in his professional opinion, constitute floodplain authorization for

structures in the channel, and that proceeding without such authorization

exposes the association and its members to liability he would be sorry, in

every sense, to see itemized after the fact. He signed it, and then he did the

thing his profession had taught him and his temperament seconded: he made

it redundant. He drove into Kingsbury and delivered a copy by hand to the

clubhouse office, and had the association's manager stamp it received and

initial the stamp; and he sent the original by certified mail, return receipt

requested, to the same address, so that the letter existed in the world twice,

once in a hand and once in a record, the way you set two gauges on a dam.

The manager, stamping, asked him cheerfully whether this was about the

bridges, and Marcus said it was, and the manager said Deb would be glad to

have his input on file, input being the word, and Marcus thanked her and

drove home under a sky the color of a galvanized roof.

16

That night he sat on his porch with the day's heat still coming off the

News in the same category

HOA Karen Built Three Bridges On His Land — Unaware The Dam Engineer Upstream Could Drain Her Park’s Biggest Attraction

45 Part