When I finished, I read the three columns back and closed the notebook. The year had cost money, time, and an easy neighborliness. It had not cost the pool, the house, or my name on any document that mattered. The balance was not favorable, and I did not pretend otherwise. But it balanced. The debits were real, the credits were real, and neither side required exaggeration to be understood. I filed the notebook with the binder, not inside it but beside it, and I went to make dinner. Winter accounting, done honestly, does not ask for sympathy. It asks only that the numbers be allowed to stand as written, until spring gives them something new to record.
In March, the light changed first, before the weather did. It came back over the fence a little earlier each evening, and it fell on the covered pool with a quality I recognized from other springs: a practical light, fit for inspecting work. I telephoned Aqua Design Solutions in the second week of the month and asked to confirm the spring schedule. Tom Alvarez answered, and he remembered the house, the pool, and the September quote without my having to remind him of any of it. The replastering and the pump replacement were still priced as quoted, he said, and the crew could begin in April, weather permitting. I confirmed the dates, and I wrote them in my diary in ink.
The decision to refill was not a dramatic one, and I did not treat it as such. I had drained the pool for two reasons, and both reasons had been satisfied: the replastering was now scheduled, and the safety question had been answered by a locked gate and a changed code. There was no further reason to keep the pool empty, and keeping it empty out of caution alone would have turned a maintenance decision into a monument. I am not in the habit of building monuments. I signed the work order, filed my copy with the September quote, and paid the deposit by check. The balance would be due on completion, as before, and I noted both amounts in the house ledger.
The crew arrived on a Tuesday in April, which meant Doug adjusted his visit to the following day without complaint. There were four men, and they worked with the unhurried competence of people who have replastered many pools and do not need to narrate their work. I watched from the kitchen window for the first hour, and then I went out to inspect, because inspecting is what I do and because Tom expected it. The old plaster came off in sections, revealing the concrete shell beneath, gray and sound. The tile border, which had been chipped in places by years of use, was repaired where it needed repair and left where it did not. I asked two questions, both about drainage and curing time, and Tom answered both directly. I wrote his answers down.
The pump replacement took a day on its own. The old pump, which had served for twelve years, was disconnected, lifted out, and set aside on the deck like a retired piece of equipment that had earned its rest. The new pump was installed, tested, and run briefly, and Tom showed me the pressure readings and explained what they should be in normal operation. I recorded the readings in the house ledger, next to the invoice, because a reading written down at installation is worth more than a memory of one six months later. Doug came the next day, looked at the new pump, nodded once, and said it was a good unit. I valued his opinion, because he was the man who would maintain it.
When the replastering was finished, the pool was a different color than it had been: not dramatically different, but cleaner, paler, more even, the way a freshly painted room is the same room and yet not quite. I walked the perimeter slowly, checking the coping, the tile, and the steps, and I found one small rough patch near the shallow end. I pointed it out to Tom without apology, and he had it smoothed before the crew left. That is the correct order of things: notice, state, correct, confirm. I signed the completion certificate, paid the balance by check, and filed both documents with the original contract from twelve years earlier. The file for the pool was now thicker by two invoices, and it was complete in a way that had nothing to do with Sandra and everything to do with maintenance.