I Drained My Pool — Then Karen Returned With The Cops Claiming It Was Hers

Chapter 6

Theme:
Font Size:
24px

The county permit came first, before any digging. I remember the permit because I had to wait for it, and waiting for a piece of paper is a particular kind of test for a person who likes things to move in order. The permit had conditions: setbacks from the fence, depth markings, a fence and a gate that locked, a final inspection before the pool could be filled. I read the conditions and I filed the permit in a folder, and when the inspector came, I was home, and I answered his questions without embellishment. He measured. He checked the fence. He checked the gate latch. He wrote things down in a notebook that reminded me, pleasantly, of my own.

The digging took a week. I watched it from the kitchen window in the mornings before work, the way you watch any large, expensive thing being made in your yard: with a mixture of fascination and a low, accountant's anxiety about whether the hole in the ground would, in the end, resemble the drawing on the contract. It did. By Friday, the shape was there, clean and rectangular, with the deep end dug deeper than the shallow, sloping down in a smooth, deliberate grade. The men worked quietly and well, and they left the yard tidy at the end of each day, which told me more about them than any reference letter had.

The shell went in, the plumbing went in, the tile border went in, tile by tile, in the blue I had chosen from a sample board in the Aqua Design office. I had chosen it because it was not flashy. It was a plain, steady blue, the color of water when water is behaving itself. The coping went around the rim, stone, warm even then in the spring sun. I ran my hand along it when the crew had gone, and it felt solid in a way that a promise rarely does. It felt like something that would still be there in twelve years, holding its line.

Then came the inspections, plural, because a pool is not a shed. The county inspector came back, measured again, checked the depth markings — nine feet at the deep end, marked plainly — checked the drain covers, checked the fence and the gate once more. He signed the final inspection certificate, and the certificate had my name on it: Rachel Pemberton, owner of record, 14 Cloverfield Road. I filed it behind the permit, in front of the contract, in the folder that would later become Tab 1. I did not frame it. I filed it. Framing is for things you want to look at. Filing is for things you want to be able to prove.

I paid the balance with a second canceled check, drawn on the same account as the deposit, and I filed that too, behind the deposit check, so the two of them sat together like a pair of bookends. Then, on a clear afternoon, Aqua Design filled the pool. I watched the water rise, inch by inch, over the plaster, over the main drain, up the tile border, until the rectangle I had imagined for three years was suddenly, quietly, blue. I did not jump in that day. I stood on the deck and looked at it, and I felt the same orderly relief I had felt on the day I signed for the house. The columns balanced. The water was mine.

Doug's first Tuesday came the week after the fill. He arrived in a van with his name on it, walked the pool with a net and a test kit, checked the chemicals, left a receipt on the patio table, and went on his way. I initialed the receipt and filed it. I did not know, that Tuesday, that I was starting a file that would run to six hundred and twenty-four receipts, one for every week, for twelve years. I knew only that the water was clear, the tile was straight, and the routine had begun.

For twelve years, Doug cleaned my pool every Tuesday. I say that sentence now the way I would say that the sun rose every morning, because, in my life, the two statements had a similar reliability. Tuesdays were Doug days. He arrived in the late morning, usually between ten and eleven, in his van, with his net, his brush, his test kit, and a manner so plainspoken that it took me a year to realize how much I liked it. He did not make small talk unless I started it. He did not offer opinions about the neighbors. He tested the water, he told me what it needed, he did what it needed, and he left a receipt.

News in the same category

I Drained My Pool — Then Karen Returned With The Cops Claiming It Was Hers

45 Part